JET GROUTING PILES (JGP)

 


A JGP worksite (Sanshin catalogue)


A JGP worksite (Utraco catalogue)

  JGP work sequence:
1 Drill down to required depth;
2 High pressure cement milk emerges from the nozzel;
3 As drilling rod rotates and withdrawn, the cement milk mixes the soil
4 Cement ground column is formed
(Utraco catalogue)


Schematic of JGP work set-up (Utraco catalogue)

 


Jet Grouting Piles (JGP) installation

 